Reung Kiet Lithium Project (PAM 100%)

Reung Kiet Lithium Prospect – Mineral Resource Estimate (JORC 2012)

MT Li2O (%) Sn (%) Ta2O5 (%) Rb (%) Cs (%) LCE (t)
Oxide 3.2 0.49 0.03 0.009 0.15 0.02 38,611
Fresh 7.2 0.42 0.04 0.009 0.16 0.02 74,416
Total 10.4 0.44 0.04 0.009 0.16 0.02 113,027
Mineral Resource is classified as Inferred and reported above 0.25% Li2O cut-off. Appropriate rounding applied. Refer to ASX announcement dated 28 June, 2022.
Mineral Resource at various cut-off grades.
Cut-off (%) MT Li2O (%) Sn (%) Ta2O5 (%) Rb (%) Cs (%) LCE (t)
0.10 21.5 0.30 0.03 0.007 0.13 0.02 159,315
0.15 17.1 0.34 0.03 0.007 0.14 0.02 143,606
0.20 13.3 0.39 0.04 0.008 0.15 0.02 128,119
0.25 10.4 0.44 0.04 0.009 0.15 0.02 113,027
Appropriate rounding applied. Refer to ASX announcement dated 28 June, 2022.

Bang I Tum Prospect – Exploration Target (JORC 2012, Drill Supported)

MT Li2O (%) Sn (%) Ta2O5 (ppm) Rb (%) Cs (ppm) K (%)
Lower 8.0 0.80 0.09 120 0.30 250 2.80
Upper 14.0 0.50 0.07 95 0.24 210 2.40
Exploration Target is drill supported and reported using a 0.1% Li2O cut-off. Appropriate rounding applied. Refer to ASX announcement dated 27 July, 2022.

Khao Soon Tungsten Project (PAM 100%)

Exploration Target (JORC 2012, drill supported)

Prospect Tonnes (m) Grade WO3 (%)
Than Pho West 4 – 8 0.2 – 0.4
Than Pho Ridge 1 – 2 0.2 – 0.4
Target 2 6 – 12 0.1 – 0.3
Rabbit 4 – 7 0.2 – 0.4
Total 15 – 29 0.2 – 0.4
Exploration Target is drill supported and reported using a 0.05% WO3 lower bound and 0.10% WO3 upper bound cut-off. Appropriate rounding applied. Refer to ASX announcement dated 08 October, 2020.